Networks: Flow, matching and scheduling problems

Networks: Flow, matching and scheduling problems

11th - 12th Grade

20 Qs

quiz-placeholder

Similar activities

Review 1 Curve Sketching Unit Test: Critical #,Relativ, Absol Ex

Review 1 Curve Sketching Unit Test: Critical #,Relativ, Absol Ex

10th Grade - University

18 Qs

One Step Variable Solutions (20 Questions)

One Step Variable Solutions (20 Questions)

9th - 12th Grade

20 Qs

Calc Review for Quiz 5. 2nd Sem. Absolute Extrema& Rolle's Theo

Calc Review for Quiz 5. 2nd Sem. Absolute Extrema& Rolle's Theo

9th - 12th Grade

15 Qs

JEE TEST ON LOGIC 3 CONDUCTED BY PROF.S.D.WASANKAR

JEE TEST ON LOGIC 3 CONDUCTED BY PROF.S.D.WASANKAR

12th Grade

20 Qs

Set (Lorekan)

Set (Lorekan)

11th Grade

20 Qs

Set 3: Soalan Set dan Operasi

Set 3: Soalan Set dan Operasi

12th Grade - University

15 Qs

Converting Quadratic Forms

Converting Quadratic Forms

10th - 11th Grade

19 Qs

UJIAN MATEMATIK TINGKATAN 4-MCO

UJIAN MATEMATIK TINGKATAN 4-MCO

11th Grade

20 Qs

Networks: Flow, matching and scheduling problems

Networks: Flow, matching and scheduling problems

Assessment

Quiz

Mathematics

11th - 12th Grade

Hard

Created by

Akhtar Shamim

Used 5+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Media Image

What is the capacity of the Cut 1

10

12

22

23

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Media Image

What is the capacity of Cut 3

32

24

19

22

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What does the cut means?

The cut means to break the network

The cut means maximum flow

The cut means to separate source and sink

The cut means to draw a dotted line.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

The maximum flow of this network is

18

19

20

21

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Media Image

The maximum flow of this network is

22

20

15

13

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Media Image

p = Earliest starting time for activity P

q = the completion time of the network

r = Latest starting time of activity Q.

The value of r , p and q in the network shown are.

p=5, q = 9, r = 7p=5,\ q\ =\ 9,\ r\ =\ 7

p=7, q = 9, r = 5p=7,\ q\ =\ 9,\ r\ =\ 5

p=9, q = 7, r= 5p=9,\ q\ =\ 7,\ r=\ 5

p = 5, q= 5, r= 9p\ =\ 5,\ q=\ 5,\ r=\ 9

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Media Image

The immediate predecessor activities for activity D are.

G and F

E and C

C and F

A and C

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?