Pre-Test API 570

Pre-Test API 570

1st - 5th Grade

21 Qs

quiz-placeholder

Similar activities

QUIZ 1 : TOPIC 8 [PROCESS COSTING]

QUIZ 1 : TOPIC 8 [PROCESS COSTING]

1st Grade - University

20 Qs

Electrical symbols -definitions

Electrical symbols -definitions

2nd Grade

20 Qs

Tidal Energy

Tidal Energy

5th Grade - Professional Development

20 Qs

ch 7 Kerangka Kerja Konseptual

ch 7 Kerangka Kerja Konseptual

KG - Professional Development

19 Qs

Daily Quiz 19May2020_ Refresher of Vivo Services and Product

Daily Quiz 19May2020_ Refresher of Vivo Services and Product

KG - Professional Development

20 Qs

CorpU & LVC Adhi Karya

CorpU & LVC Adhi Karya

1st - 5th Grade

20 Qs

CLOSING - SALES - Apr23

CLOSING - SALES - Apr23

1st Grade

20 Qs

Glaze Eduction

Glaze Eduction

1st Grade - University

19 Qs

Pre-Test API 570

Pre-Test API 570

Assessment

Quiz

Professional Development

1st - 5th Grade

Practice Problem

Hard

Created by

Ipetro Services

Used 14+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

21 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Under the requirement of ASME code, Section

IX, welding procedure specification used to:

Test the welding machine

Ensure weldment properties.

Determine the welder’s skills

Determine the welding operator’s skills.

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following is the cause of corrosion under insulation(CUI) of refinery and chemical plant equipment?

The corrosion is caused from the use of the wrong material for the equipment

The corrosion is caused by not having an on-going and complete inspection program

The corrosion is caused by long term lack of maintenance

The corrosion results from water trapped under insulation and fireproofing

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

All of the following can be an API-570 authorized inspection agency except the inspection organization of:

The owner/user

The jurisdiction

A manufacturer

An insurance company

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The ASME section IX A number is based on

The weld ability characteristic of a groups of metal alloy

The chemical composition of the electrode.

The chemical composition of the deposit weld metal

A group of base metal having specified impact test requirements.

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A welder’s performance qualification may expire when the welder has not welded particular process for more than:

1 month

10 weeks

3 months

6 months

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the interval for thickness measurement on a Class 1 piping system?

5 years

10 years

The lesser of 5 years or ½ remaining life of the pipe

The lesser of 10 years or ½ remaining life of the pipe

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is a defect in pressure piping?

An imperfection that exceeds the specified acceptance criteria.

A response or indication of a flaw noted during the application of non-destructive examination.

Flaws or others discontinuities discovered during inspection.

A flaw that may or may not be rejectable, depending upon size.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?