
English
5th Grade
CCSS covered
Used 116+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
9 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
Click the color yellow
Tags
CCSS.RF.1.2A
CCSS.RF.2.3A
CCSS.RF.4.3A
CCSS.RF.K.1D
CCSS.RF.K.2A
2.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
Click the orange juice
Tags
CCSS.RI.5.7
CCSS.RL.4.7
CCSS.RL.5.7
CCSS.RL.6.7
CCSS.RI.6.7
3.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Click the picture with 4 apples
Tags
CCSS.1.NBT.A.1
4.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
Click the shark
Tags
CCSS.L.1.6
CCSS.L.3.6
CCSS.L.4.6
CCSS.L.K.5A
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Face painters first prepare the child's face for the products they will apply. Then, they ask the child to pick out the design, from which they carefully create the outline of choice. After that, they fill in the bright colors, and while the paint is still damp, they spray a little glitter on it.
What do they do before they create the outline?
They fill in the bright colors.
They ask the child to pick out the design.
They spray glitter.
Tags
CCSS.RI.5.3
CCSS.RI.5.5
CCSS.RI.6.5
CCSS.RI.4.5
CCSS.RI.6.3
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
One of the first things a physical education teacher will do is show the class how to stretch. First, they demonstrate how to stretch your upper body muscles. Then, they show how to stretch your legs, and after that, they teach
exercises to make your whole body stronger.
What do they teach before stretching?
stretching is the first thing
lessons in exercises
how to make your body stronger
Tags
CCSS.RI.5.3
CCSS.RI.5.5
CCSS.RI.6.5
CCSS.RI.6.3
CCSS.RI.4.3
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
To paint a mural on a wall, first the surface has to be prepared. Old, chipped paint needs to be removed, after which the wall must be made smooth and clean. A background coat of paint follows, and then the basic outlines of the picture are sketched on, and after that, it's time to paint.
After the background paint, what happens?
The wall is prepared.
The wall is finished.
The outlines are sketched.
Tags
CCSS.RI.5.3
CCSS.RI.5.5
CCSS.RI.6.5
CCSS.RI.4.5
CCSS.RI.4.3
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?