Site Works

Site Works

10th Grade

10 Qs

quiz-placeholder

Similar activities

NCFE L1/2 Engineering Introduction Quiz

NCFE L1/2 Engineering Introduction Quiz

9th - 12th Grade

15 Qs

Design and technology and our world

Design and technology and our world

7th - 11th Grade

10 Qs

Notes on Blender - Section 7 Review

Notes on Blender - Section 7 Review

6th Grade - University

10 Qs

Belt-Disc Sander Safety Quiz

Belt-Disc Sander Safety Quiz

8th Grade - University

15 Qs

iMedia R094 TA2

iMedia R094 TA2

10th Grade

11 Qs

Timbers

Timbers

10th Grade

10 Qs

Exploring Careers: Arts, A/V Technology & Communication

Exploring Careers: Arts, A/V Technology & Communication

9th - 12th Grade

15 Qs

Chapter 7: Getting started with Adobe Premiere Pro

Chapter 7: Getting started with Adobe Premiere Pro

9th - 12th Grade

10 Qs

Site Works

Site Works

Assessment

Quiz

Design

10th Grade

Practice Problem

Medium

Created by

Kevin Allen

Used 19+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All of the following are site work activities EXCEPT.

Backfill

Drainage

Grading

Painting

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. Which site work is the process of moving earth rock or other materials with tools, equipment or explosives?

Excavation

Grading

Drainage

Backfilling

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The underground chamber made of concrete, fiberglass, or plastic through which domestic wastewater flows for basic treatment is a _____________________.

Landscaping

Septic Tank

Drainage

Sewer System

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which site work is a technique used by excavation professionals to adjust the slope of an area prior to building construction?

Excavation

Backfilling

Strip Site

Grading

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Site work is _____________________________.

This aspect of the site work has to do with the architect and surveyor lazing on with each other to design the plans for the proposed dwelling.

The enabling work which prepares the site for construction.

Identifying, sizing, and placing temporary facilities within the boundaries of construction site.

The preliminary soil work of getting a construction site ready for building and development.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The image shown above is the representation of a _________________.

Survey Report

Site Work Layout

Floor Plan

Drawwing

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Architects and surveyors lazing on with each other to design the plans for the proposed dwelling is called a __________________.

Site Work Layout

Planning and coordination

Site Work

Project Planning

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?