Quiz on Unit 3

Quiz on Unit 3

University

85 Qs

quiz-placeholder

Similar activities

Signals & Systems Phase 1

Signals & Systems Phase 1

University

80 Qs

BSOA Topic 2 Quiz

BSOA Topic 2 Quiz

University

88 Qs

Quiz TS 25

Quiz TS 25

University

86 Qs

Bismillah Bisa

Bismillah Bisa

University

81 Qs

1810 - Unit 1 - CH 1-4

1810 - Unit 1 - CH 1-4

University

89 Qs

EdSS1

EdSS1

University

80 Qs

วิชาทางการพยาบาล 8 รายวิชา

วิชาทางการพยาบาล 8 รายวิชา

University

80 Qs

Cumulative Nutrition Exam

Cumulative Nutrition Exam

University - Professional Development

81 Qs

Quiz on Unit 3

Quiz on Unit 3

Assessment

Quiz

Other

University

Practice Problem

Medium

Created by

Director, HRDC JNTUH

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

85 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

1. Which of the following earth dam is suitable only on impervious foundation?

Zoned embankment type

Homogenous embankment type

Non-homogenous type

Diaphragm type

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

2. Which of the following zone in Zoned type embankment prevents piping through cracks?

Central core

Transition zone

Outer zone

Core wall

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

3. Which embankment has the thickness of the diaphragm at an elevation less than 10 meters or the height of the embankment above the corresponding elevation?

Diaphragm type dam

Zoned type dam

Non-homogenous earth dam

Homogenous earth dam

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

4. The blanket in earth dam is provided ___________________

at the ground level on u/s side

at the ground level on the d/s side

at the ground level of the D/s side of the dam

on the D/s slope

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

5. Which of the following statement is correct with reference to earthen dams?

These dams are very costly as compared to other types

Gravity dams are less susceptible to failure as compared to rigid dams

These dams are suitable for construction on almost every type of foundation

Highly skilled labor is generally not required

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

6. During the construction of an earthen dam by hydraulic fill method, development of pore pressure becomes important in the ________

central impervious core

pervious outer shell

transition zone

both central core and outer shell

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

7. The process of laying and compacting earth in layers by power rollers under OMC for construction of earthen dams is known as ______________________

Rolled fill method

Hydraulic fill method

OMC method

Compaction

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?