ECM566 Construction Project Management

ECM566 Construction Project Management

1st Grade

10 Qs

quiz-placeholder

Similar activities

SANDI A=N & SANDI A=Z

SANDI A=N & SANDI A=Z

1st - 12th Grade

10 Qs

Quiz o minecraft'cie

Quiz o minecraft'cie

1st Grade

11 Qs

Mall Visit Quiz

Mall Visit Quiz

1st Grade

11 Qs

BGS Music Quiz

BGS Music Quiz

1st - 12th Grade

10 Qs

rubiks cube quiz

rubiks cube quiz

KG - Professional Development

13 Qs

General Knowledge (TEST)

General Knowledge (TEST)

KG - 12th Grade

10 Qs

Inside Solutions

Inside Solutions

1st - 5th Grade

8 Qs

Quiz de Introducción a la Computación

Quiz de Introducción a la Computación

1st Grade

10 Qs

ECM566 Construction Project Management

ECM566 Construction Project Management

Assessment

Quiz

Professional Development, Other, Life Skills

1st Grade

Practice Problem

Medium

Created by

Mazlina Zaira Mohammad

Used 130+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Parties involved during the construction except

Supplier

Authorities

FInancial company

Jabatan Kerja Raya

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Role of contractor are ;


i) To built and complete the construction based on contract.

ii) To comply with the local authorities regulation.

iii) Own and finance the project.

iv) to bear all the carried out and completed work at the site.

i, ii and iii

i, ii and iv

i and iv

iii and iv

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Local authorities during construction are....


i) Tenaga Nasional Berhad

ii) Telekom Malaysia

iii) Jabatan Bomba & Penyelamat

iv) Indah Water Konsortium

ii, iii dan iv

i and iii

i and iv

i, ii, iii and iv

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Role of Jabatan Kerja Raya are..

i) Provide guidance on construction technology advice
ii) Provide technical advice to the government at the state, state and district levels.
iii) Examine and test the completed fire prevention system.
iv) Ensure clients comply with EIA orders. 

i dan ii

i and iii

i and iv

iii and iv

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Characteristic of construction management are ....


i) Complex and it involves a number of individuals from different departments.

ii) Unique and cannot be replicated.

iii) Consists of a number of associated activities

iv) Satisfy the owners requirement and expectations from the project.

i and ii

i and iii

ii, iii and iv

i, ii, iii and iv

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The major differences between  projects and operations are:

Projects are ongoing and operations are short
Projects should always be done by engineers and operations may be performed by technicians
Projects are temporary and operations are ongoing
Projects and operations are the same thing but projects always costs more to implement

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

How are project costs calculated?

By adding human resources (staff hours times billing rates), plus the marked-up costs of material resources

By adding up the costs of all materials

By a calculation so complicated only a computer could do it

By multiplying the human resources by the material resources

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?