20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Define Demolition
Process of taking off any existing structures and non-structures
Process of taking off any existing structures only
Process of taking off building material
Process of removing all tress and green
2.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Types of demolition
bridge
Structures
non-structures
brickwork
3.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
All are the reasons why demolition is conducted, except
To construct a new building
The existing building is not sufficient to accommodate current occupants
Old and damage building
The existing building is being ordered from the consultant to conduct a demolition works
4.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Which type of demolition is suitable for the above picture?
General & site clearance
Building
Structure
Scrap material
5.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Which types of demolition is suitable for the above picture?
General and site clearance
Building
Structure
Scrap material
6.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
All of the below is the example of structure demolition, except?
Bridge
Tunnel
Railway
School
7.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
This type of demolition usually being found as unused construction material on the site for example reinforcement bar, steel pipe & brc etc. This demolition material fall under which category?
General & site clearance
Building
Structure
Scrap material
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?