Cold Water 6035 LO2

Cold Water 6035 LO2

Professional Development

15 Qs

quiz-placeholder

Similar activities

HSC_Competency 5 Response to Service Challenges

HSC_Competency 5 Response to Service Challenges

Professional Development

12 Qs

How Well Do You Know Avery?

How Well Do You Know Avery?

Professional Development

10 Qs

The Hotel School

The Hotel School

Professional Development

12 Qs

i-LEAD 2

i-LEAD 2

Professional Development

10 Qs

Food Additives Quiz 1

Food Additives Quiz 1

University - Professional Development

16 Qs

LUX- DAY 4

LUX- DAY 4

Professional Development

10 Qs

Relationship B/W HT - HT & HT - Youth

Relationship B/W HT - HT & HT - Youth

Professional Development

10 Qs

Cold Water 6035 LO2

Cold Water 6035 LO2

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Anthony Price

Used 124+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Grey water is safe for drinking

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What colour is MDPE?

Black

Blue

Red

Yellow

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At which point on a cold water supply system do the Water Regulations come into force?

From the Boundary stop valve

From the ferrule

From the water treatment plant

From the stop valve inside the property

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the stainless steel screen found in warning pipe connectors and cistern vents?

To prevent filtered air from entering the cistern

To prevent dead insects fro leaving the cistern in case of overflow

To prevent insects/vermin from entering the system

To provide frost protection

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the Water Regulations, where should a stop valve be placed

Inside the airing cupboard, as close as possible to the door

Under the floorboards near the front door

Inside the building, as close as possible to the entry point of the pipe.

Outside the building as close as possible to the front door

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum amount of MDPE that should be visible above floor level?

350mm

150mm

450mm

250mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where should drain off valves be placed?

At the high point of every run

Anywhere that it can't be seen

At the low point of every pipe run

None of these

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?

Discover more resources for Professional Development