AM Product Owner

AM Product Owner

1st Grade

27 Qs

quiz-placeholder

Similar activities

English

English

1st - 11th Grade

23 Qs

CKS Sharepoint

CKS Sharepoint

1st Grade

22 Qs

Jacksons dopeness quiz (biology review)

Jacksons dopeness quiz (biology review)

1st Grade - Professional Development

22 Qs

Physics based Calculus

Physics based Calculus

1st - 5th Grade

23 Qs

POST TEST S1

POST TEST S1

1st Grade

24 Qs

VALUES EDUC.

VALUES EDUC.

1st Grade

25 Qs

Hansa Renkei

Hansa Renkei

1st - 3rd Grade

25 Qs

Name the DC Superheroes

Name the DC Superheroes

KG - University

25 Qs

AM Product Owner

AM Product Owner

Assessment

Quiz

Professional Development

1st Grade

Medium

Created by

Marco Tommasone

Used 8+ times

FREE Resource

27 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Who has the authority to cancel a Sprint?

Product Owner

Scrum Master

Development Team

All roles together

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The length of a Sprint should be?

Short enough to keep the business risk acceptable to the Product Owner.

Short enough to be able to synchronize the development work with other business events.

No more than one calendar month.

All of these answers are correct.

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What happens during Sprint 0?

Overall planning, base system architecture, base design, version control and continuous integration setup.

Establish base system architecture and design, install version control and continuous integration setup.

Base system architecture and design.

There is no such thing as Sprint 0.

Requirements gathering, version control setup, and continuous integration setup.

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

To deliver a single product, three Development teams are formed. How many Product Owners are needed?

As many as recommended by the Scrum Master

Three

One

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The product Backlog is ordered by:

Least valuable items at the top to most valuable at the bottom

Size

Risk

Items are randomly arranged

Whatever is deemed most appropriate by the Product Owner

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

During the sprint a Development Team determines that it will not be able to finish the complete forecast. Who should be present to review and adjust the Sprint work selected?

The Product Owner and all stakeholders

The Development Team

Scrum Master, The Project Manager and the Development Team

The Product Owner and the Development Team

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

When might a Sprint be abnormally cancelled

When the Sprint Goal becomes obsolete

When it becomes clear that not everything will be finished by the end of the Sprint

When the sales department has an important new opportunity

When the Development Team feels that the work won't be finished in the sprint time frame.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?