Core Module 5 Intro to Construction Drawings

Core Module 5 Intro to Construction Drawings

9th - 12th Grade

15 Qs

quiz-placeholder

Similar activities

Krianki GK Quiz

Krianki GK Quiz

1st Grade - University

10 Qs

Entrepreneurship

Entrepreneurship

9th - 12th Grade

20 Qs

CHAINS REACTION 1

CHAINS REACTION 1

7th Grade - University

10 Qs

SN2121 MSK and Neurological class

SN2121 MSK and Neurological class

6th Grade - University

10 Qs

Super Smash Brothers.

Super Smash Brothers.

KG - Professional Development

12 Qs

TLE10 - Pre-test

TLE10 - Pre-test

10th Grade

18 Qs

Drawing Vocabulary

Drawing Vocabulary

9th - 12th Grade

15 Qs

Entrepreneurship - Finance Vocab

Entrepreneurship - Finance Vocab

9th - 12th Grade

15 Qs

Core Module 5 Intro to Construction Drawings

Core Module 5 Intro to Construction Drawings

Assessment

Quiz

Life Skills

9th - 12th Grade

Medium

Created by

Christopher Foy

Used 238+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The identification of lines and other symbols on a construction drawing is called the _____.

index

title block

legend

scale

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Site plans are developed using a(n) ____

architect's scale

NTS scale

engineer's scale

1/4" = 1'-0" scale

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A dimension is a measurement written as a __

range

number

letter

symbol

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Gridlines are used to _____.

indicate a cross-section of material

indicate that an object has been broken off

indicate land boundaries on the site plan

make it easy to refer to specific locations on the plan

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On the drawing, a project is identified by the _____ found in the title block.

sheet title

company logo

scale

legend

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To avoid confusion, the letters I, O, and Q and the numbers 1 and 0 are omitted from the _____.

sheet title

company logo

gridline system

legend

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To clarify information that cannot be shown on the drawings, the architectural and engineering firm will prepare _____.

a change order

proposal

specifications

contracts

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?