
PLTW Building With Vex
Authored by todd williamson
Other
6th - 8th Grade
Used 367+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Iterative most closely means:
Easy
Building and Rebuilding
Slow
Programming
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are most parts of the VEX Structure subsystem made of?
Rubber
Plastic
Bent Sheet Metal
Gold
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Square holes on VEX pieces are how far apart?
1 inch
1/4 inch
1/2 inch
1 cm
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Small tabs are all that are required to hold a VEX Bearing Flat onto a structural piece.
True
False
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
VEX 8-32 screws are attached using which tool?
Pliers
Hammer
Glue
Allen Wrench
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which type of nut is used in an assembly where you do not want them to come off due to vibration or movement?
KEPS
Nylock
Standard
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which type of nut has "teeth" which hold onto the structure?
KEPS
Nylock
Standard
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?