
Hydroelectric Power Station
Flashcard
•
University
•
Practice Problem
•
Hard
Wayground Content
FREE Resource
Student preview

9 questions
Show all answers
1.
FLASHCARD QUESTION
Front
The water turbine drives the generator which converts __________.
Back
The mechanical energy to electrical energy
2.
FLASHCARD QUESTION
Front
The advantage of hydroelectric power station.
Back
Very small running operation cost
3.
FLASHCARD QUESTION
Front
The disadvantage of hydroelectric power station.
Back
It involve high capital cost due to construction of dam.
4.
FLASHCARD QUESTION
Front
Water stored behind the dam is known as ____________
Back
Water reservoir
5.
FLASHCARD QUESTION
Front
This takes the water from reservoir to water turbine.
Back
Penstock
6.
FLASHCARD QUESTION
Front
How many Liters is 500 mL?
Back
.5
7.
FLASHCARD QUESTION
Front
When you measure how long it takes to fill 500mL beaker, you are measuring ________.
Back
flowrate
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?