Structural Members Flashcard

Structural Members Flashcard

Assessment

Flashcard

Other

KG

Hard

Created by

Wayground Content

FREE Resource

Student preview

quiz-placeholder

20 questions

Show all answers

1.

FLASHCARD QUESTION

Front

As a group, the common methods of modifying structural members can be referred to as _____?

Back

structural penetrations

2.

FLASHCARD QUESTION

Front

At what location is notching not permitted in structural members?

Back

The center third

3.

FLASHCARD QUESTION

Front

The maximum permissible size for a hole bored through the center of a floor joist is _____.

Back

one-third the depth of the joist

4.

FLASHCARD QUESTION

Front

When a floor joist is cut back and reinforced to clear a fitting, the process is called _____?

Back

boxing

5.

FLASHCARD QUESTION

Front

For installations where multiple pipes are run side-by-side, an often-used support method is the _____?

Back

trapeze hanger

6.

FLASHCARD QUESTION

Front

Fiberglass pipe insulation is supplied with a laminated cover layer referred to as ASJ. What does ASJ stand for?

Back

All service jacket

7.

FLASHCARD QUESTION

Front

When soldering a fitting prior to applying flexible foam insulation using the slip-on method, push the insulation on the pipe away from the fitting and _____?

Back

apply clamps to the pipe

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?