1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of a Disaster Recovery Plan (DRP)?

To prevent all disasters from occurring.

To detail how to resume operations after a disaster.

To identify potential security vulnerabilities.

To manage daily IT operations.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the Recovery Time Objective (RTO) measure?

The amount of data lost during an outage.

The time it takes to prevent a disaster.

The time required to resume operations after an outage.

The frequency of system failures.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the Recovery Point Objective (RPO) indicate?

The total duration of system downtime.

The maximum acceptable amount of data loss.

The average time to repair a system.

The cost of disaster recovery services.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which metric helps predict how long it will take to fix a system after a failure?

Recovery Point Objective (RPO)

Recovery Time Objective (RTO)

Mean Time To Repair (MTTR)

Mean Time Between Failures (MTBF)

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the site resiliency process after a problem has been addressed at the alternate processing site?

Preparing the recovery site

Synchronizing data to the alternate site

Reverting back to the primary location

Calling a disaster

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following best describes a cold site for disaster recovery?

An exact replica of the primary data center with all hardware and data

A site with some infrastructure like power and racks, but requiring hardware and data to be brought in

An empty building with no hardware or data, requiring everything to be transported

A fully operational site that can take over immediately with a flip of a switch

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key characteristic of a hot site for disaster recovery?

It is an empty building where hardware and data must be brought in

It is a site with basic infrastructure, requiring only software and data to be loaded

It is an exact replica of the primary data center, stocked with hardware and constantly updated applications and data

It is a temporary location used for tabletop exercises

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of a tabletop exercise in disaster recovery planning?

To physically test the failover process to an alternate site

To determine the logistics of a disaster response by talking through a simulated scenario

To install and configure new hardware at a recovery site

To perform scheduled updates and maintenance on production systems