1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of a level sensor when controlled by a PLC?

To adjust the lighting in a room

To measure temperature changes

To maintain a specific level in a tank

To control the speed of a motor

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to terminate the shield and drain wire only at the PLC end?

To enhance the power supply to the sensor

To prevent data loss

To increase the speed of data transmission

To reduce the harmful effects of electrical noise

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What role does a VFD play in controlling a motor?

It acts as a power source

It measures the motor's temperature

It adjusts the motor's torque

It controls the speed of the motor

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How can a technician optimize analog control using a PID instruction?

By increasing the power supply

By adjusting the motor speed

By changing the sensor type

By modifying parameters related to the instruction

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be checked to determine if the wiring between the PLC and the sensor is faulty?

The color of the wiring

The voltage or current at the sensor

The length of the cable

The temperature of the sensor