

Vajont Dam Disaster Impact Assessment
Interactive Video
•
Geography
•
9th - 10th Grade
•
Practice Problem
•
Hard
Emma Peterson
FREE Resource
Read more
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the primary purpose of the Vajont Hydroelectric Dam?
To provide irrigation for agriculture
To control flooding in the region
To generate hydroelectric power
To serve as a tourist attraction
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the initial warning sign that something was wrong with Mount Toc?
A change in weather patterns
Unusual animal behavior
Cracks appearing on the mountain
A sudden increase in water level
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What did the scientific research in late 1960 reveal about Mount Toc?
It was experiencing volcanic activity
It was stable and posed no threat
It was waterlogged and unstable
It was eroding due to wind
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How did the authorities respond to the findings about Mount Toc in 1962?
They evacuated the nearby villages
They ignored the findings
They lowered the water level by over 70 feet
They reinforced the dam structure
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
On October 9, 1963, how fast did the rockslide travel compared to expectations?
At the expected speed
Twice as fast as expected
Three times faster than expected
Half the expected speed
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the immediate consequence of the rockslide on the Vajont reservoir?
It created two giant waves
It caused a drought
It increased the water level
It stabilized the mountain
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which village was miraculously spared the worst of the wave?
Venice
Erto
Longarone
Belluno
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?