Renewable Energy and Power Projects

Renewable Energy and Power Projects

Assessment

Interactive Video

Science, Geography, Business

9th - 12th Grade

Hard

Created by

Patricia Brown

FREE Resource

Australia is advancing in renewable energy with projects like the AA Powerlink, which includes the world's longest undersea power cable to deliver solar energy to Singapore. Despite challenges like supply-demand mismatches and blackouts, battery storage systems are being developed to stabilize the grid. Major projects like the Aaring battery and Limestone Coast Energy Park are crucial. The AA Powerlink aims to export energy to Singapore, reducing reliance on fossil fuels. However, challenges such as high costs and battery longevity remain. Australia is committed to increasing its battery storage capacity significantly by 2035.

Read more

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary goal of the world's longest undersea power cable being built by Australia?

To provide internet connectivity

To deliver solar energy from the Outback to Singapore

To connect Australia to New Zealand

To transport oil across the ocean

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a major challenge faced by renewable energy sources like solar and wind in Australia?

They are not environmentally friendly

They require a lot of maintenance

They are too expensive to install

Their energy generation doesn't always match demand

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How do large-scale batteries help stabilize the energy grid?

By reducing the need for solar panels

By storing excess electricity and releasing it when needed

By generating their own electricity

By increasing the reliance on fossil fuels

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the expected capacity increase needed for Australia's energy storage by 2030?

A 700% increase

A 500% increase

A 100% increase

A 50% increase

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the Aaring Battery Project in New South Wales?

To replace all coal-fired power stations

To export energy to neighboring countries

To provide backup power for hospitals

To store excess renewable energy and ensure grid stability

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much energy can the Limestone Coast Energy Park store?

1.5 gigawatt hours

2.5 gigawatt hours

3.5 gigawatt hours

4.5 gigawatt hours

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the AA Powerlink project's main export destination for its energy?

Japan

Singapore

Indonesia

New Zealand

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?