Glacier National Park - West Tunnel

Glacier National Park - West Tunnel

Assessment

Interactive Video

Arts, Architecture, Engineering

KG - University

Hard

Created by

Quizizz Content

FREE Resource

The video discusses the construction of a tunnel in 1926, highlighting the challenges faced using the technology of the time, such as dynamite and jackhammers. Work was halted due to harsh winter conditions and resumed in 1927. The tunnel features observation windows and a sidewalk, but caution is advised due to low visibility. Originally unlined, the tunnel was later reinforced to prevent damage from falling rocks and stabilize the structure.

Read more

5 questions

Show all answers

1.

OPEN ENDED QUESTION

3 mins • 1 pt

What technology was used to bore through the mountain in 1926?

Evaluate responses using AI:

OFF

2.

OPEN ENDED QUESTION

3 mins • 1 pt

What were the winter temperatures that forced workers to stop working?

Evaluate responses using AI:

OFF

3.

OPEN ENDED QUESTION

3 mins • 1 pt

What features were created in the tunnel to offer views?

Evaluate responses using AI:

OFF

4.

OPEN ENDED QUESTION

3 mins • 1 pt

What precautions should be taken while walking inside the tunnel?

Evaluate responses using AI:

OFF

5.

OPEN ENDED QUESTION

3 mins • 1 pt

What was the condition of the tunnel as originally constructed?

Evaluate responses using AI:

OFF