Mighty Sea Crane: Building and Testing the Oleg

Mighty Sea Crane: Building and Testing the Oleg

Assessment

Interactive Video

Arts, Architecture, Engineering

10th - 12th Grade

Hard

Created by

Quizizz Content

FREE Resource

The video details the assembly and testing of the Oleg Strashnov crane ship. It begins with the assembly of the crane, including the integration of the motor housing and the installation of the boom. The process involves precise positioning and the use of specialized equipment. The video then covers the setup of cables and winches, crucial for the crane's operation. Finally, the crane undergoes rigorous testing to ensure its capacity and functionality, including lifting tests and system calibration. The Oleg Strashnov is highlighted as a versatile and powerful crane ship.

Read more

3 questions

Show all answers

1.

OPEN ENDED QUESTION

3 mins • 1 pt

What was the purpose of reeling the cables and ropes?

Evaluate responses using AI:

OFF

2.

OPEN ENDED QUESTION

3 mins • 1 pt

What characteristics make the Oleg Strashnov crane ship unique?

Evaluate responses using AI:

OFF

3.

OPEN ENDED QUESTION

3 mins • 1 pt

How was the crane's lifting capacity tested?

Evaluate responses using AI:

OFF