A TRICKY JOB

A TRICKY JOB

Assessment

Interactive Video

History

KG - University

Hard

Created by

Wayground Content

FREE Resource

The video discusses the construction and navigation of a 26,000-ton floating dock. It highlights the challenges faced in moving the dock through narrow spaces at Bremerhaven by using water ballast to tilt it. The dock, intended for the Niarchos shipyard in Greece, can accommodate ships up to 50,000 tons. The successful floating of the dock to the River Vesa is also covered.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the weight of the floating dock mentioned in the video?

26,000 tons

10,000 tons

50,000 tons

100,000 tons

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What method was used at Bremerhaven to solve the narrow space problem?

Reducing the dock's weight

Disassembling the dock

Applying a heavy list with water ballast

Using a tugboat

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the destination of the floating dock?

Port of Hamburg

Bremerhaven

River Vesa

Niarchos shipyard in Greece

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum ship capacity that the dock can handle?

100,000 tons

50,000 tons

26,000 tons

10,000 tons

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the final step in the dock's journey mentioned in the video?

Construction at Bremerhaven

Disassembly for transport

Arrival at the Niarchos shipyard

Floating through the lock to the River Vesa