The video tutorial describes a heavy blast operation expected to bring down 50 to 60,000 tonnes of limestone from a quarry. The quarry face measures 82 feet in height and 200 feet in width. The preparation involves placing powder, coupling electric wires to primers, and blocking tunnels with stone.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the expected outcome of the heavy blast?

To increase the height of the quarry

To bring down 50 to 60,000 tonnes of limestone

To create a new quarry face

To reduce the width of the quarry

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the height of the quarry face?

50 feet

200 feet

100 feet

82 feet

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the width of the quarry face?

200 feet

150 feet

250 feet

300 feet

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is done after the powder is placed in position?

The quarry face is measured

The electric wires are coupled up to the primers

The limestone is transported

The quarry is expanded

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How are the tunnels secured after preparation?

With metal bars

With concrete

With wooden planks

With stone

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?