Mighty Sea Crane: Building and Testing the Oleg

Mighty Sea Crane: Building and Testing the Oleg

Assessment

Interactive Video

Arts, Architecture, Engineering

10th - 12th Grade

Hard

Created by

Quizizz Content

FREE Resource

The video details the assembly and testing of the Oleg Strashnov crane ship. It begins with the assembly of the crane, including the integration of the motor housing and the installation of the boom. The process involves precise positioning and the use of specialized equipment. The video then covers the setup of cables and winches, crucial for the crane's operation. Finally, the crane undergoes rigorous testing to ensure its capacity and functionality, including lifting tests and system calibration. The Oleg Strashnov is highlighted as a versatile and powerful crane ship.

Read more

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the first major component integrated into the crane assembly?

The boom

The motor housing

The ballast

The A-frame

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which company was responsible for moving the boom onto the crane body?

Sarens of Rotterdam

Oleg Strashnov

Shidam Docks

SPMS Transport

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the significance of the automatic gears in the crane's operation?

They ensure uniform lifting speed

They increase the crane's lifting capacity

They help in assembling the crane

They reduce the crane's height

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the special characteristics of the Oleg Strashnov crane ship?

It can lift 10,000 tons

It is the fastest ship in the world

It is incredibly versatile

It has the largest crew capacity

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How was the crane's lifting capacity initially tested?

By lifting a barge with sand

By lifting concrete blocks

By lifting steel beams

By lifting balloon-shaped containers filled with sea water

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What additional weight was added during the crane's final testing phase?

An extra 100 tons

An extra 1000 tons

An extra 500 tons

An extra 200 tons

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the final outcome of the crane's testing?

The crane was not tested

The crane passed with flying colors

The crane failed the tests

The crane passed with minor issues