Underground rough in

Underground rough in

Assessment

Interactive Video

Other

11th Grade

Hard

Created by

Christopher Richard

Used 2+ times

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step Josh takes to start the plumbing process?

Pouring concrete

Installing pipes

Digging trenches

Setting up string lines

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why does Josh use a 45-degree elbow in the plumbing layout?

To connect to the main water line

To ensure proper drainage slope

To make the installation easier

To save on material costs

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of pipe does Josh recommend using under a concrete slab?

Cellular core PVC

Copper pipes

Schedule 40 solid PVC

Galvanized steel pipes

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What tool does Josh use to cut the PVC pipe?

Hacksaw

Circular saw

Miter saw

Jigsaw

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does Josh test the plumbing for leaks?

By filling the pipes with air

By using a test T balloon plug and filling with water

By using a pressure gauge

By running water through the pipes