Day 30-Oct 18-Worksheet-PWD AE-PSC,retaining wall & water tank

Day 30-Oct 18-Worksheet-PWD AE-PSC,retaining wall & water tank

1st - 5th Grade

15 Qs

quiz-placeholder

Similar activities

Kuis Mengenal Kompas Geologi

Kuis Mengenal Kompas Geologi

3rd Grade

10 Qs

Kuiz Sifat Mekanikal Logam

Kuiz Sifat Mekanikal Logam

4th Grade

20 Qs

Comparators and Schmitt Triggers Quiz

Comparators and Schmitt Triggers Quiz

2nd Grade

15 Qs

Exploring Power Electronics

Exploring Power Electronics

3rd Grade

10 Qs

Conocimientos de Estadística Inferencial

Conocimientos de Estadística Inferencial

4th Grade

15 Qs

Ensaio de END

Ensaio de END

1st Grade - University

10 Qs

Day 31-Oct 20-Btech-worksheet-Mortar

Day 31-Oct 20-Btech-worksheet-Mortar

1st - 5th Grade

15 Qs

Day 36-worksheet-Btech-Concrete technology part 2

Day 36-worksheet-Btech-Concrete technology part 2

1st - 5th Grade

15 Qs

Day 30-Oct 18-Worksheet-PWD AE-PSC,retaining wall & water tank

Day 30-Oct 18-Worksheet-PWD AE-PSC,retaining wall & water tank

Assessment

Quiz

Engineering

1st - 5th Grade

Hard

Created by

WINCENTRE CLASSES

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the load balancing method of prestressed concrete, the shape of the cable is determined based on —

Shear force diagram

Moment–curvature relationship

Bending moment diagram

Stress–strain curve

2.

FILL IN THE BLANK QUESTION

1 min • 1 pt

A beam of cross-section 200 mm × 400 mm is prestressed with 400 kN force at 100 mm eccentricity. The maximum compressive stress in concrete is —

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For M40 concrete in a water tank designed by WSM, the permissible bending tension in serviceability limit is —

2.0 N/mm²

2.4 N/mm²

2.6 N/mm²

2.8 N/mm²

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The resultant earth pressure on a retaining wall acts at a height of —

h/2 from base

h/4 from base

h/3 from base

h/3 from top

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A counterfort retaining wall is preferred when the retained height exceeds —

2 m

4 m

6 m

9 m

6.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

The minimum grade of concrete for pretensioned prestressed concrete is ____________.

7.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

The percentage loss of prestress is given by = ________.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?