DAY 27 WORKSHEET LSGD (RCC Retaining Wall)

DAY 27 WORKSHEET LSGD (RCC Retaining Wall)

1st Grade

15 Qs

quiz-placeholder

Similar activities

PMP - Time

PMP - Time

University

10 Qs

LEA 1 QUIZ #1 IN FINAL

LEA 1 QUIZ #1 IN FINAL

1st Grade

15 Qs

Vodacom E-centive

Vodacom E-centive

1st Grade

20 Qs

Air quality monitoring

Air quality monitoring

1st - 2nd Grade

14 Qs

Prelim Exam for EDUC 61

Prelim Exam for EDUC 61

University

20 Qs

Nelson´s training session

Nelson´s training session

8th Grade - Professional Development

16 Qs

REVIEW

REVIEW

10th - 12th Grade

10 Qs

Chapter 8. Securing Network Media and Devices

Chapter 8. Securing Network Media and Devices

University

20 Qs

DAY 27 WORKSHEET LSGD (RCC Retaining Wall)

DAY 27 WORKSHEET LSGD (RCC Retaining Wall)

Assessment

Quiz

Professional Development

1st Grade

Practice Problem

Hard

Created by

WINCENTRE CLASSES

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a cantilever retaining wall, if the backfill is inclined at 10° to the horizontal, the resultant earth pressure will —

Act normal to the backfill surface

Act parallel to the backfill surface

Act at an angle determined by surcharge and wall friction

Always remain horizontal

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For a retaining wall 6 m high, if the base width is insufficient to resist shear, a shear key is introduced. Its main function is to —

Increase bearing area

Reduce overturning moment

Mobilize passive earth pressure in front of the toe

Distribute load uniformly under the footing

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the resultant of forces acts beyond the middle third and causes tension under part of the base, the actual pressure diagram becomes —

Triangular with maximum at toe only

Trapezoidal with uniform compression

Parabolic

Uniform

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a counterfort wall, the counterforts act structurally as —

Cantilevers fixed at toe

Compression struts tying the stem and heel

Shear connectors between stem and toe

Diaphragm supports at the front face

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a retaining wall fails by overturning, the most effective design modification is —

Increase wall height

Increase base width toward heel side

Reduce backfill unit weight

Provide vertical reinforcement in stem

6.

FILL IN THE BLANK QUESTION

1 min • 1 pt

TRUE OR FALSE

In design for sliding stability, both frictional and passive resistances are considered, but passive resistance is ignored in seismic analysis.

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

TRUE OR FALSE

A buttressed retaining wall is preferred over counterfort type when backfill access must remain clear.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?