ConTech M06 - Floor Systems

ConTech M06 - Floor Systems

9th - 12th Grade

20 Qs

quiz-placeholder

Similar activities

Orientation to Carpentry

Orientation to Carpentry

9th Grade

15 Qs

Basic Electrical Construction Documents (Electrical L1) Quiz

Basic Electrical Construction Documents (Electrical L1) Quiz

12th Grade

20 Qs

SCROLL SAW QUIZ

SCROLL SAW QUIZ

9th Grade

16 Qs

Initial assessment 301 part 2

Initial assessment 301 part 2

12th Grade

19 Qs

MT Environmental Learner Outcome 5

MT Environmental Learner Outcome 5

11th Grade

19 Qs

unit 113 powerpoint 3

unit 113 powerpoint 3

10th Grade

21 Qs

First Fix Carpentry Quiz

First Fix Carpentry Quiz

12th Grade

15 Qs

305 Cold water systems 3 Quiz

305 Cold water systems 3 Quiz

2nd Grade - University

18 Qs

ConTech M06 - Floor Systems

ConTech M06 - Floor Systems

Assessment

Quiz

Construction

9th - 12th Grade

Medium

Created by

Russel Fausnight

Used 1+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

In braced frame construction, the corner posts and beams are:

nailed

mortised and tenoned

pinned

glued

2.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

In balloon framing, the second floor joists sit on a:

plate nailed to the top plate of the wall assembly below

1x4 or 1x6 ribbon 'let in' to the wall studs

sill attached to the top of the wall assembly below

2x4 'let in' to the wall studs

3.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

Shrinkage in wood framing members occurs mainly:

lengthwise

both lengthwise and on the wide width

on the wide width

in the middle

4.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

The most common framing method used in modern residential and light commercial construction is ___________ framing.

brace

balloon

platform

post-and-beam

5.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

The method of construction that experiences a relatively large amount of settling as a result of shrinkage is _________ framing

platform

brace

balloon

post-and-beam

6.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

The method of construction that features widely spaced, heavy framing members is _________ framing

brace

balloon

platform

post-and-beam

7.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

In a set of working drawings, the details about the floor used in a building most likely will be defined in the:

architectural drawings

structural drawings

mechanical plans

site plans

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?