CMT 6 floor systems trade terms
Authored by Wayground Content
Specialty
University
Used 9+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The first and last joists in a floor system that run parallel to the common joists are called:
Rim Joists
Header Joists
Blocking Joists
Sill Joists
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The weight of permanent, stationary construction and equipment included in a building is referred to as:
Live load
Dead load
Wind load
Snow load
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a length of lumber applied over a joint to strengthen it called?
Scab
Brace
Beam
Strut
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The highest point of the curved edge of a framing member is called:
Crown
Base
Edge
Peak
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is temporary bracing used to support above-grade concrete slabs while they set called?
Shoring
Scaffolding
Formwork
Reinforcement
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a metal or fiberglass concrete form used for two-way joist systems called?
Waffle form
Beam form
Slab form
Panel form
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the total of all moving and variable loads that may be placed upon a structure called?
Dead load
Live load
Static load
Environmental load
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?