2024 Practice Test #3

2024 Practice Test #3

Professional Development

100 Qs

quiz-placeholder

Similar activities

Plumbing Knowledge: Tools, code, and equations

Plumbing Knowledge: Tools, code, and equations

Professional Development

99 Qs

NURSING PRACTICE 3 📌 FINAL PROOF READ MAY NLE 2022

NURSING PRACTICE 3 📌 FINAL PROOF READ MAY NLE 2022

Professional Development

98 Qs

Retail Assets Quiz, BA, Pune

Retail Assets Quiz, BA, Pune

Professional Development

100 Qs

Injuries

Injuries

Professional Development

98 Qs

Retail Assets

Retail Assets

Professional Development

102 Qs

Deloitte (Aptitude Test)

Deloitte (Aptitude Test)

Professional Development

100 Qs

D4(RAH) MASTER THE DAY

D4(RAH) MASTER THE DAY

Professional Development

101 Qs

Module 6 QC Green 200-298

Module 6 QC Green 200-298

Professional Development

98 Qs

2024 Practice Test #3

2024 Practice Test #3

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Mike Sommerfeldt

FREE Resource

100 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

System inspections shall be performed prior to concealing piping distribution systems in ________.

walls

ceilings

chases

any of the listed locations

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following does NFPA 99 consider NOT an acceptable qualification for an individual performing maintenance on a Category 1 medical gas system?

ASSE 6010

ASSE 6030

ASSE 6040

Documented training program

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Master alarm panels shall NOT communicate ___________ to the alarm initiating devices they monitor.

directly

indirectly

directly or indirectly

there is no specification in NFPA 99

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Threaded joints shall be made up with ________________ recommended for oxygen service.

polyvinylchloride tape

potlytetrafluoroehtylene tape

polypropylene tape

polyimide tape

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Receivers for medical air shall be equipped with ____________.

Relief valves

Automatic and manual drains

Sight glass

All of the equipment listed is required

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The cryogenic fluid central supply system shall have a local signal that visibly indicates the operating status, and an indicator at all master alarms, when or at a predetermined set point before the main supply falls to an average day’s supply indicating ____________.

system failure

maintenance needed

low contents

secondary in use

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The master alarm system shall include an indication when the pressure in the main line increases or decreases _______ % from normal oprating pressure.

10

20

30

50

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Professional Development