2024 Practice Test #3

2024 Practice Test #3

Professional Development

100 Qs

quiz-placeholder

Similar activities

TRY OUT PPPK PJOK SD

TRY OUT PPPK PJOK SD

Professional Development

100 Qs

PCT Exam 3

PCT Exam 3

Professional Development

100 Qs

GPM Exam 2 Review (part 2)

GPM Exam 2 Review (part 2)

Professional Development

100 Qs

1-5 N+

1-5 N+

University - Professional Development

100 Qs

PFRC 2023 - SOAL 401-500

PFRC 2023 - SOAL 401-500

Professional Development

100 Qs

PFRC 2023 - SOAL 601-700

PFRC 2023 - SOAL 601-700

Professional Development

100 Qs

Post Test : Steam & Condensate System LNHT-ISOM

Post Test : Steam & Condensate System LNHT-ISOM

Professional Development

100 Qs

11 - 15 N+

11 - 15 N+

University - Professional Development

100 Qs

2024 Practice Test #3

2024 Practice Test #3

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Hard

Created by

Mike Sommerfeldt

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

100 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

System inspections shall be performed prior to concealing piping distribution systems in ________.

walls

ceilings

chases

any of the listed locations

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following does NFPA 99 consider NOT an acceptable qualification for an individual performing maintenance on a Category 1 medical gas system?

ASSE 6010

ASSE 6030

ASSE 6040

Documented training program

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Master alarm panels shall NOT communicate ___________ to the alarm initiating devices they monitor.

directly

indirectly

directly or indirectly

there is no specification in NFPA 99

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Threaded joints shall be made up with ________________ recommended for oxygen service.

polyvinylchloride tape

potlytetrafluoroehtylene tape

polypropylene tape

polyimide tape

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Receivers for medical air shall be equipped with ____________.

Relief valves

Automatic and manual drains

Sight glass

All of the equipment listed is required

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The cryogenic fluid central supply system shall have a local signal that visibly indicates the operating status, and an indicator at all master alarms, when or at a predetermined set point before the main supply falls to an average day’s supply indicating ____________.

system failure

maintenance needed

low contents

secondary in use

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The master alarm system shall include an indication when the pressure in the main line increases or decreases _______ % from normal oprating pressure.

10

20

30

50

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?