MEMATUHI KERJA-KERJA DENGAN PERATURAN ELEKTRIK VOLTAN RENDAH

MEMATUHI KERJA-KERJA DENGAN PERATURAN ELEKTRIK VOLTAN RENDAH

University

15 Qs

quiz-placeholder

Similar activities

"6 Thinking Hats" Method

"6 Thinking Hats" Method

University

10 Qs

Elbow: BSc & MSc

Elbow: BSc & MSc

University

10 Qs

COVID 19 AWARENESS QUIZ

COVID 19 AWARENESS QUIZ

University

12 Qs

HMS UNIT 1

HMS UNIT 1

University

15 Qs

Economics Chapter 1

Economics Chapter 1

University

13 Qs

Chapter 1 Introduction to cost and management accounting

Chapter 1 Introduction to cost and management accounting

University

17 Qs

1499EDN Week 3 Cognitive Development

1499EDN Week 3 Cognitive Development

University

11 Qs

Language Origin and Properties

Language Origin and Properties

University

11 Qs

MEMATUHI KERJA-KERJA DENGAN PERATURAN ELEKTRIK VOLTAN RENDAH

MEMATUHI KERJA-KERJA DENGAN PERATURAN ELEKTRIK VOLTAN RENDAH

Assessment

Quiz

Education

University

Hard

Created by

SAhare Zuan

Used 1+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the most critical step before performing a shutdown work on a high voltage substation?

Close the substation fence

Hang a warning notice

Ground the isolated conductor

Measure the load current with a multimeter

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When shutdown work is performed, the NSL and SL padlock keys are used to:

Prevent the public from entering the substation

Lock the gate door for safety

Lock the switch so it cannot be turned on again

Determine the phase direction of the line

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What voltage reading proves that the circuit is completely safe to touch after shutdown?

Between phases = 415V, phase-neutral = 230V

Between phases = 0V, phase-neutral = 0V

Between phases = 11kV, phase-neutral = 6.6kV

Between phases = 1000V, phase-neutral = 600V

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why can live line work only be performed by workers with special certification?

To reduce maintenance costs

Because they have been trained with special techniques & PPE

So that work can be completed faster

To avoid the use of testing equipment

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main function of the HRC fuse in the LV distribution board?

Stabilize voltage at the transformer

Determine load balance between phases

Protect the final circuit from overload & short circuit

Control the power factor rate of the load

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first action when needing to climb a wooden pole for overhead line work?

Ensure the pole is not leaning

Check for wood rot before climbing

Hang a safety rope first

Test voltage using a phasing stick

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why should line work not be carried out during bad weather?

Difficult to obtain testing readings

Can reduce the stability of the wooden pole

Risk of shock & lightning increases

Cannot hang warning signs clearly

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?