Integrative Project

Integrative Project

University

7 Qs

quiz-placeholder

Similar activities

Quiz sobre Distribuições de Probabilidade Discreta

Quiz sobre Distribuições de Probabilidade Discreta

University

10 Qs

T9 SDU

T9 SDU

University

10 Qs

Introducción al Dibujo Técnico

Introducción al Dibujo Técnico

University

10 Qs

Input & Output Interfacing Raspberry Pi Pico

Input & Output Interfacing Raspberry Pi Pico

University

10 Qs

Embedded Systems

Embedded Systems

University

10 Qs

ANOVA

ANOVA

University

10 Qs

MAGNETISMO

MAGNETISMO

University

10 Qs

Quiz sobre la Organización de Talleres Mecánicos

Quiz sobre la Organización de Talleres Mecánicos

University

10 Qs

Integrative Project

Integrative Project

Assessment

Quiz

Engineering

University

Practice Problem

Hard

Created by

Angie Osorio

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

7 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

1 min • 1 pt

A project is a temporary endeavor undertaken to create a unique (p)_______

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The correction of a defect in an end item is an example of:

A unique service

A unique product

A unique result

A unique combination of one or more products

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A temporary endeavor in projects refers to:

Projects drive change in organizations

Projects are undertaken at all organizational levels

Indicates that a project has a definite beginning and end

I don't remember

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

When does a poject come to an end? (choose two options)

The project’s objectives have been achieved

The objectives will not or cannot be met

The human or physical resources are no longer available

The project is terminated for legal cause or convenience

Developing a new pharmaceutical compound for market

Expanding a tour guide service

I promise to study for the next quiz

5.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Media Image

The desired result of the change driven by the project is described as:

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Refers to the benefit that the results of a specific project provide to its stakeholders.

Project initiation

Current state

Project management

Business value

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Media Image

What is the word in the middle?