CHAIN SURVEYING

CHAIN SURVEYING

University

5 Qs

quiz-placeholder

Similar activities

Quiz: Accident History + OSH Act 1994

Quiz: Accident History + OSH Act 1994

University

5 Qs

Quiz

Quiz

University

10 Qs

Understanding the Isohytel Method

Understanding the Isohytel Method

University

10 Qs

TUGAS SP PTI (1)

TUGAS SP PTI (1)

University

10 Qs

Internal Analysis

Internal Analysis

University

10 Qs

VLSI Design Flow Quiz

VLSI Design Flow Quiz

University

10 Qs

SURVEYING-II QUIZ2

SURVEYING-II QUIZ2

University

5 Qs

CHAIN SURVEYING

CHAIN SURVEYING

Assessment

Quiz

Engineering

University

Medium

Created by

Shantinath Naganur

Used 1+ times

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. The smallest division in a metric chain is:

5 MM

10 CM

1 M

20 CM

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2.  Which of the following is NOT a method of ranging?

DIRECT RANGING

INDIRECT RANGING

RECIPROCAL RANGING

PARALLEL RANGING

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. In the stepping method of ranging on sloping ground, what is done?

The line is measured in short horizontal lengths 

A series of right angles are established

A plumb bob is used to transfer points to the ground 

The line is measured using a tape measure 

4.

FILL IN THE BLANK QUESTION

1 min • 1 pt

4.     A metallic chain using in chain surveying are provided with joining many number of links and the each length link is __________.

5.

FILL IN THE BLANK QUESTION

1 min • 1 pt

5.     ________________ Tape is generally preferred for high-precision linear measurements in surveying, such as baseline measurement.