D53 MASTER THE DAY

D53 MASTER THE DAY

Professional Development

50 Qs

quiz-placeholder

Similar activities

ALLWAYS Transportation Service Quiz

ALLWAYS Transportation Service Quiz

Professional Development

50 Qs

BSN-III_NCM114_FINALS

BSN-III_NCM114_FINALS

Professional Development

50 Qs

FINAL English for Workplace (os 44)

FINAL English for Workplace (os 44)

Professional Development

50 Qs

FIRST OF EVERYTHING

FIRST OF EVERYTHING

Professional Development

50 Qs

Induction, Product Knowledge, 5 soc

Induction, Product Knowledge, 5 soc

Professional Development

50 Qs

PEDAGOGIK 3

PEDAGOGIK 3

Professional Development

54 Qs

Real Estate Section II pt 2

Real Estate Section II pt 2

Professional Development

54 Qs

'B' Coy Mock Test 1 (ASM Part 1 & 7)

'B' Coy Mock Test 1 (ASM Part 1 & 7)

KG - Professional Development

55 Qs

D53 MASTER THE DAY

D53 MASTER THE DAY

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

WINCENTRE CLASSES

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following stations is an example of a terminal station?
Shornur Junction
Eranakulam Junction
Thrissur
CST Mumbai

Answer explanation

CST Mumbai is a terminal station where rail lines terminate with engine reversal facility.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the typical minimum width of a goods platform?
3.66 m
2.55 m
3.1 m
4.275 m

Answer explanation

Goods platforms have a standard minimum width of 3.1 meters.

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which station allows both booking and waiting facilities for passengers?
Signal post
Station
Crossing
Loop line

Answer explanation

A station is a designated place for booking and waiting for trains.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is a track component used at dead ends for safety?
Cow catcher
Fouling mark
Buffer stop
Crossover

Answer explanation

Buffer stops are installed at dead ends of tracks to stop runaway vehicles.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the standard platform height for Meter Gauge stations?
76 cm
69 cm
31 cm
61 cm

Answer explanation

The standard height for MG platforms is 31 cm from the top of the rail.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which plate laying method uses temporary tram tracks to deliver materials?
Telescopic method
American method
Tram line method
Side method

Answer explanation

Tram line method uses temporary lines to collect and transport track materials.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which equipment is used to reverse engines in stations with space limitations?
Traverser
Turn Table
Triangle
Buffer Stop

Answer explanation

Turn tables rotate the locomotive 360° in limited space at major stations.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Professional Development