Cold Water Unit Assessment

Cold Water Unit Assessment

44 Qs

quiz-placeholder

Similar activities

Blank Quiz

Blank Quiz

KG - University

47 Qs

Hydrological Cycle Test

Hydrological Cycle Test

KG - University

41 Qs

Dasar Dasar Kejuruan

Dasar Dasar Kejuruan

KG - University

42 Qs

0TKR

0TKR

KG - University

49 Qs

Hand Tools Usage Quiz

Hand Tools Usage Quiz

3rd Grade

47 Qs

Cold Water Unit Assessment

Cold Water Unit Assessment

Assessment

Quiz

others

Hard

Created by

Sean Baines

FREE Resource

44 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing a new indirect cold water system, which of the following should happen, according to the Water Regulations?
a. One tap, normally the kitchen sink, should be drawn directly from the supply pipe
b. One tap, normally the kitchen sink, should have a dedicated distribution pipe from the storage cistern
c. Mixer taps will require double check valves
d. Mixer taps should never be installed due to the pressure differences.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the Water Regulations, a drain off valve should be installed:
a. At every draw off point
b. At every high point in the system
c. At every low point in the system
d. Above the cold water storage cistern.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of valve is designed to shut off the supply of water in a cistern at a predetermined level?
a. Stop valve
b. Fullway gate valve
c. Float operated valve
d. Isolation valve.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What year did the Water Regulations come into force in England and Wales?
a) 2006.
b) 2003.
c) 1999.
d) 1996.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing a new cold water service pipe from the boundary stop tap to the stop tap within the property, it should normally be buried between what depths below ground level?
135 mm and 1750 mm
350 mm and 750 mm
1350 mm and 1750 mm
1350 mm and 750 mm

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following pipework materials is not permitted to be installed in a new cold water system?
a) Copper.
b) Lead.
c) Stainless steel.
d) MDPE.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following should be positioned immediately above the cold water supply stop valve near to the point of entry into a building?
a) Water filter.
b) Pressure reducing valve.
c) Flow limiting valve.
d) Drain valve.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?