1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of protective canopy must be provided at tunnel portals?
Timber canopy
Fire-resistive canopy
Metal frame canopy
Temporary canvas canopy
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The protective canopy at tunnel portals must project at least:
10 feet
12 feet
15 feet
20 feet
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who must design rock bolt support systems in tunnel ground support?
Site Foreman
Professional Engineer (PE)
Construction Supervisor
Safety Officer
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is strictly prohibited for tunnel ground support?
Steel ribs
Timber supports and wood lagging
Rock bolts
Chain link fabric
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What must be done if tunnel supports are damaged or dislodged?
Delay work for 24 hours
Immediately repair or replace them
Install temporary bracing only
Remove and leave unsupported temporarily
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What must be provided where rock bolts are in use?
Hydraulic jacks
Torque meters and torque wrenches
Bracing beams
Fire suppression systems
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In haulage systems, what must be inspected every shift?
Signal cables
Tunnel ventilation
Locomotives and haulage cars
Lighting circuits
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?