1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of protective canopy must be provided at tunnel portals?

Timber canopy

Fire-resistive canopy

Metal frame canopy

Temporary canvas canopy

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The protective canopy at tunnel portals must project at least:

10 feet

12 feet

15 feet

20 feet

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who must design rock bolt support systems in tunnel ground support?

Site Foreman

Professional Engineer (PE)

Construction Supervisor

Safety Officer

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is strictly prohibited for tunnel ground support?

Steel ribs

Timber supports and wood lagging

Rock bolts

Chain link fabric

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be done if tunnel supports are damaged or dislodged?

Delay work for 24 hours

Immediately repair or replace them

Install temporary bracing only

Remove and leave unsupported temporarily

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be provided where rock bolts are in use?

Hydraulic jacks

Torque meters and torque wrenches

Bracing beams

Fire suppression systems

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In haulage systems, what must be inspected every shift?

Signal cables

Tunnel ventilation

Locomotives and haulage cars

Lighting circuits

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?