Electrical Continuity Bonding Quiz

Electrical Continuity Bonding Quiz

12th Grade

20 Qs

quiz-placeholder

Similar activities

Pipes and cistern

Pipes and cistern

10th Grade - Professional Development

20 Qs

Insurance Basics & Auto Insurance

Insurance Basics & Auto Insurance

9th Grade - Professional Development

20 Qs

Direct and Indirect Speech

Direct and Indirect Speech

9th Grade - Professional Development

20 Qs

Graduate 1-15 Using in a Sentence

Graduate 1-15 Using in a Sentence

11th - 12th Grade

15 Qs

Hairstyling Vocabulary

Hairstyling Vocabulary

11th - 12th Grade

15 Qs

Intro to Welding (SMAW)

Intro to Welding (SMAW)

9th Grade - University

20 Qs

ET 26209

ET 26209

9th - 12th Grade

23 Qs

Welding Chapter 2

Welding Chapter 2

11th - 12th Grade

18 Qs

Electrical Continuity Bonding Quiz

Electrical Continuity Bonding Quiz

Assessment

Quiz

Professional Development

12th Grade

Hard

Created by

Steve Whaling

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

What is the purpose of electrical continuity bonding?

To increase electrical resistance

To ensure safety by maintaining equal potential

To reduce the cost of electrical installations

To enhance the speed of electrical current

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the purpose of equipotential bonding in a building's electrical system?

To increase the voltage

To provide equal potential between metal parts

To reduce the current flow

To enhance the building's insulation

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What must all metal parts within a building be joined to, according to equipotential bonding requirements?

The main power line

The earth cable

The water supply

The gas line

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the size of the earth cable used in equipotential bonding?

5mm²

8mm²

10mm²

12mm²

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the purpose of supplementary bonding in electrical tasks?

To increase voltage

To maintain earth continuity

To reduce current

To enhance signal strength

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the purpose of using temporary continuity bonds when cutting into pipework?

To prevent water leakage

To maintain earth continuity and prevent electric shock

To support the pipework structure

To enhance the flow of water

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the first step in attaching an earth continuity clamp?

Clean the pipe (no paint).

Identify the correct pipe.

Secure the clamp tightly on pipe.

Test continuity.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?