Part 107 Operations Review

Part 107 Operations Review

11th Grade

98 Qs

quiz-placeholder

Similar activities

CH 15 Exam - Urinary

CH 15 Exam - Urinary

10th - 12th Grade

97 Qs

Steering & Suspension

Steering & Suspension

10th - 12th Grade

100 Qs

1-100

1-100

10th Grade - University

100 Qs

Part 107 Operations Review

Part 107 Operations Review

Assessment

Quiz

Specialty

11th Grade

Hard

Created by

Diane McPherson

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

98 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is the primary purpose of a preflight inspection for a remote PIC operating a sUAS?

To ensure the sUAS is in a condition for safe operation.

To increase the speed of the sUAS.

To improve the appearance of the sUAS.

To reduce the weight of the sUAS.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the text, what should a preflight inspection checklist for a sUAS include at a minimum?

A visual or functional check of critical components.

A detailed weather report.

A list of previous flight locations.

A record of pilot training hours.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to inspect propeller blades for nicks, cracks, or bends before a sUAS flight?

Such damage can degrade structural integrity and impact controllability and safety.

It makes the sUAS look more professional.

It increases the battery life of the sUAS.

It helps the sUAS fly faster.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a recommended practice if a battery appears “bloated” or abnormal during a preflight inspection?

Do not use or charge the battery.

Charge the battery immediately.

Use the battery for a short flight.

Store the battery in the sUAS.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT listed as a minimum item to check during a preflight inspection?

Weather conditions at the flight location.

Visual condition of sUAS components.

Registration markings for legibility.

Servo motor attachment points.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A remote PIC notices that the propeller installation does not follow manufacturer guidelines. What is a potential consequence of this oversight?

Separation of the blade in flight, loss of control, and possible injury or damage.

Increased battery efficiency.

Improved camera performance.

Reduced noise during flight.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to verify that all systems have an adequate energy supply before a sUAS flight?

To ensure the intended operation can be completed safely.

To make the sUAS lighter.

To improve the color of the sUAS lights.

To reduce the need for future inspections.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?