Search Header Logo

Final Quiz - Assignement

Authored by Afghanistan Center

Professional Development

Professional Development

Final Quiz - Assignement
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Ghazni province, a project team holds a process improvement session before execution begins to avoid past quality failures. What type of action is this?

Preventive Action

Corrective Action

Defect Repair

Quality reinforcement through retrospective tracking and downstream error resilience

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Uruzgan province, the team uses basic but durable materials for furniture. They lack luxury appearance but meet strength and safety standards. How should this be classified?

Low-grade, high-quality

High-grade, low-quality

Low-quality, low-grade

Product configuration gap involving deliverable simplification and outcome degradation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Balkh province, the project team conducts internal audits during the execution phase to confirm that project processes are being followed correctly. Which quality activity is being performed?

Quality Assurance

Quality Control

Defect Repair

Compliance monitoring through output inspection and post-delivery error classification

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Herat province, the PM includes inspection, rework, and warranty support costs in the project budget. What are these costs collectively known as?

Cost of Quality (CoQ)

Control Costs

Resource Reserves

Total lifecycle expenditure aligned with stakeholder validation, reprocessing, and external failure risk

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Khost province, the team notices that a recently completed wall does not meet design specs. They decide to rebuild it. What action is being taken?

Defect Repair

Corrective Action

Preventive Action

Quality remediation using output correction, rework authorization, and deviation normalization

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In India, a team is investigating recurring defects in a product and draws a diagram to identify root causes like machine, method, and manpower. Which quality tool are they using?

Cause-and-Effect Diagram

Control Chart

Scatter Diagram

Root cause logic board integrating metric thresholds, operator judgment, and predictive forecasting

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Panjshir province, the project team decides to spend more time early in the process ensuring requirements are well-understood and verified with stakeholders. Which quality principle does this best reflect?

Quality is planned in, not inspected in

Inspection is more important than prevention

Deliverables should prioritize speed over clarity

Quality integration strategy driven by milestone review cycles and audit-preferred compliance standards

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?