Prevention Vs Correction - Assignment

Prevention Vs Correction - Assignment

Professional Development

7 Qs

quiz-placeholder

Similar activities

Machine Maintenance

Machine Maintenance

Professional Development

8 Qs

Internal control

Internal control

Professional Development

10 Qs

ASEAN Spa Services Standard

ASEAN Spa Services Standard

Professional Development

7 Qs

Pre & Post Tes TQM

Pre & Post Tes TQM

Professional Development

10 Qs

Svensqa -istqb-3

Svensqa -istqb-3

Professional Development

10 Qs

ISO 45001 Awareness and Audit

ISO 45001 Awareness and Audit

Professional Development

10 Qs

ISO 9001:2015

ISO 9001:2015

Professional Development

10 Qs

Lean Management

Lean Management

Professional Development

10 Qs

Prevention Vs Correction - Assignment

Prevention Vs Correction - Assignment

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Afghanistan Center

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Parwan province, the project team conducts training for all workers on the new quality standards before starting construction. What type of action is this?

Preventive Action

Corrective Action

Defect Repair

Proactive quality alignment effort through resource education, error blocking, and execution forecasting

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After testing the software in Badakhshan province, the team identifies and fixes bugs before delivery to the customer. What quality-related activity is this?

Defect Repair

Preventive Action

Root Cause Prevention

Functional restoration using issue mapping, gap resolution, and post-approval component realignment

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Following a review in Ghor province, the team updates the work process to prevent the recurrence of recent quality issues. What is this an example of?

Preventive Action

Corrective Action

Change Request

System-wide quality safeguard involving pattern disruption and process redesign

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After an inspection in Logar province, the manager notices the output does not match the plan. The team takes immediate steps to realign progress with the baseline. What is this response called?

Corrective Action

Preventive Action

Defect Repair

Alignment recalibration involving workstream analysis and downstream flow acceleration

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Balkh province, the project manager focuses on building quality into the process to avoid issues later, rather than fixing them afterward. Which quality philosophy does this reflect?

Prevention over Inspection

Defect Repair

Scope Validation

Cost-risk balance through post-delivery tolerance reduction and stakeholder-reported issue mapping

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During construction in Helmand province, a concrete wall is discovered to be out of alignment and must be rebuilt to meet design specs. What type of quality activity is this?

Defect Repair

Preventive Action

Quality Assurance

Output realignment through physical rework and defect reconfiguration protocol

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Kandahar province, the quality team creates a checklist to be used before every major delivery to reduce the chance of errors. What is this an example of?

Preventive Action

Corrective Action

Control Rework

Error-blocking mechanism using standardized inspection triggers and pre-delivery safeguard steps