Quiz on Industrialised Building System (IBS)

Quiz on Industrialised Building System (IBS)

University

10 Qs

quiz-placeholder

Similar activities

Sixth Grade

Sixth Grade

6th Grade - University

10 Qs

Gunning Chapter 8

Gunning Chapter 8

University

10 Qs

CHAPTER 6: SCIENTIFIC MANAGEMENT

CHAPTER 6: SCIENTIFIC MANAGEMENT

University

10 Qs

DCC2052 - Advantages and Disadvantages of IBS

DCC2052 - Advantages and Disadvantages of IBS

University

12 Qs

IBS

IBS

University

9 Qs

TEMU ALUMNI 2020

TEMU ALUMNI 2020

University

14 Qs

Lecture 6 : Sewerage Works

Lecture 6 : Sewerage Works

University

10 Qs

CONSTRUCTION INDUSTRY STANDARD

CONSTRUCTION INDUSTRY STANDARD

University

8 Qs

Quiz on Industrialised Building System (IBS)

Quiz on Industrialised Building System (IBS)

Assessment

Quiz

Other

University

Medium

Created by

NORHAZREN MOHD

Used 3+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does IBS stand for?

Integrated Building System

Industrialised Building System

Innovative Building System

Intelligent Building System

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a requirement for government projects exceeding RM10M?

Achieve 80 IBS Score

Achieve 60 IBS Score

Achieve 70 IBS Score

Achieve 50 IBS Score

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary focus of the IBS construction method?

Minimizing costs

Maximizing construction time

Producing components in controlled situations

Using more on-site workers

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to SMM2 rules, what should be included in the description of precast units?

The location of the factory

Only the size of the units

Mix or strength requirements of the concrete

The color of the units

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the clause number for 'Coping, kerbs, lintel, etc.'?

F.17

F.20

F.19

F.18

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be stated when enumerating copings, kerbs, and similar units?

Only the total length

The size and catalogue reference number

The color and texture

The location of installation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is required for the design of precast units that need temporary support?

No specific requirements

Only the size of the supports

Details of the requirements must be given

The color of the supports

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?