CENTRAL HEATING MOCK EXAM

CENTRAL HEATING MOCK EXAM

12th Grade

40 Qs

quiz-placeholder

Similar activities

knowledge check 2

knowledge check 2

12th Grade

39 Qs

Plumbing Processes PPT 3 - Site Preparation Techniques

Plumbing Processes PPT 3 - Site Preparation Techniques

12th Grade - University

42 Qs

Construction Drawings Symbols Quiz

Construction Drawings Symbols Quiz

9th - 12th Grade

37 Qs

HOT WATER PICTURES QUIZ

HOT WATER PICTURES QUIZ

12th Grade - University

42 Qs

Plumbing Processes PPT 5 - Copper and LCS pipework

Plumbing Processes PPT 5 - Copper and LCS pipework

12th Grade - University

43 Qs

Communication Quiz 2

Communication Quiz 2

12th Grade - University

45 Qs

Hot Water Systems

Hot Water Systems

12th Grade

38 Qs

LCS Pipe Fabrication Tools Quiz

LCS Pipe Fabrication Tools Quiz

12th Grade - University

40 Qs

CENTRAL HEATING MOCK EXAM

CENTRAL HEATING MOCK EXAM

Assessment

Quiz

Construction

12th Grade

Medium

Created by

Adam Dreifuss

Used 14+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a two pipe system the

flow and return pipework are separated

flow and return pipework are mixed

return water is at the same temperature as the flow water

return water temperature is higher than the flow water.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following systems does the statement apply to? ‘The temperature of the last radiator on the circuit will be cooler than the first radiator.’

Two pipe system.

One pipe system.

Two pipe reverse return system.

Microbore system.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the normal size of an open vent pipe to a fully pumped heating system, in a domestic property?

10 mm.

15 mm.

22 mm.

28 mm.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The connection of an open vent pipe and a cold feed pipe, can be made to a fully pumped system using

an automatic air vent

an injector tee

an air separator

a diverter valve.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A zone valve/two port valve in a pumped heating circuit is designed to

isolate the circuit when the desired temperature is reached

permit the system to be heated to temperatures above 100°C

stop the pump vibrating on its fixing mountings

prevent water from the flow and return pipes mixing.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The main purpose of the vent pipe installed on a heating circuit is to

fill the system with water

provide hot water to the feed and expansion cistern

introduce air into the system

protect the system in the event of over-heating.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Refer to Figure 1. Which one of the following components is indicated by the British Standard symbol shown?

Air Inlet Valve.

Draining Valve.

Double Check Valve

Pressure Relief Valve.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?