1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a conditional logic in which a process is either fully engaged or not engaged at all?
Boolean logic
And/or
If/then
On/off
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is it important to have accurate PLC ladder drawings?
Technicians did not have the training to modify diagrams.
Modifications were time-consuming.
To avoid injury.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What do PLCs allow?
Changes to the shelf position to be recorded automatically
Changes to MCCs to be recorded automatically
Changes to DCS to be recorded automatically
Changes to ladder diagrams to be recorded automatically
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is and/or logic used to control?
A process in which either one or both variables exist
A process so that the process is either fully engaged or not engaged at all
A process in which multiple conditions are present at once
A process in which one condition leads to the next
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following rely heavily on PLCs?
Washing machines
Car horns
Air conditioners
Emergency shutdown systems
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the most commonly used method for interfacing with a PLC?
Function block diagrams
Structured text
Ladder diagrams
Instruction list
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?