Structural Coverings and Finishes Practice

Structural Coverings and Finishes Practice

11th Grade

36 Qs

quiz-placeholder

Similar activities

Framing

Framing

11th - 12th Grade

35 Qs

Types of systems - Secondary ventilated stack

Types of systems - Secondary ventilated stack

11th Grade - University

36 Qs

Welding Symbols

Welding Symbols

11th - 12th Grade

40 Qs

Intro to Schoology

Intro to Schoology

6th - 12th Grade

35 Qs

EP: before giving care (T2)

EP: before giving care (T2)

9th - 12th Grade

39 Qs

Listening Skills

Listening Skills

11th - 12th Grade

35 Qs

Exploring Self College and Career Q1 Review

Exploring Self College and Career Q1 Review

8th - 12th Grade

34 Qs

Customer Service Test

Customer Service Test

5th Grade - Professional Development

36 Qs

Structural Coverings and Finishes Practice

Structural Coverings and Finishes Practice

Assessment

Quiz

Professional Development

11th Grade

Hard

Created by

Adam Geaslen

FREE Resource

36 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which tool is most likely to cause injury to an operator who has long hair that is not pulled back or secured?

Drill press

Aluminum brake

Pneumatic nailer

Reciprocating saw

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The greater the R value, the greater the ________ value.

insulation

temperature

pressure

density

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which entity is responsible for enforcing standards and providing training, outreach, education, and assistance to protect employees in the workplace?

Occupational Safety and Health Administration

Ohio State Health Advisors

Organization of Safety and Health Administrators

Occupational Safety and Health Association

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You are installing 1/2" drywall on one wall that measures 8' x 25'. How many 4' x 8' sheets should you order?

6

7

32

200

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You need to install vinyl siding on a house and the HVAC line is being replaced. You are going to use a circular saw with a 25' cord to cut siding. What PPE should you wear for this job site?

Hard hat, hearing protection, and respirator

Safety glasses, rubber gloves, and steel-toed boots

Hearing protection, safety glasses, and respirator

Hard hat, hearing protection, and safety glasses

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You are laying wood flooring in a room 10' by 15' rectangular room with 8' walls. What is the square footage of the floor in this room?

148 sq. ft.

150 sq. ft.

168 sq. ft.

180 sq. ft.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is most important when installing drywall with screws?

Screw head is slightly above drywall level

Screw head is slightly below drywall level

Screw head is driven at an angle

Screw head is flush with the drywall

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?