book 1 all

book 1 all

1st - 5th Grade

20 Qs

quiz-placeholder

Similar activities

Toán lớp 4 ôn tập cuối năm 2

Toán lớp 4 ôn tập cuối năm 2

4th - 5th Grade

20 Qs

COMPRESSIBLE FLUID FLOW

COMPRESSIBLE FLUID FLOW

1st - 10th Grade

20 Qs

Review Weeks #11-15

Review Weeks #11-15

3rd Grade

15 Qs

3-D Shapes

3-D Shapes

2nd Grade

15 Qs

vccv

vccv

3rd Grade

21 Qs

EL, Al, And LE words (phonics)

EL, Al, And LE words (phonics)

4th Grade

21 Qs

4th grade Math STAAR

4th grade Math STAAR

4th Grade

22 Qs

Math Quiz

Math Quiz

4th Grade

21 Qs

book 1 all

book 1 all

Assessment

Quiz

Mathematics

1st - 5th Grade

Hard

Created by

V Nguyễn

Used 1+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the term “megaproject” refer to in the readings?
A government plan about national spending
A cleanup effort after a natural disaster
A very large project designed for development
A small project done at a local level
A group activity usually done by students

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one purpose of the Three Gorges Dam?
To completely stop flooding in the region
To bring in more tourists from abroad
To make electricity using water power
To provide training for future engineers
To build new homes near the river

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which two projects faced similar problems with funding and delays?
NEOM and Channel Tunnel
Big Dig and Sejong City
California High-Speed Rail and Khazar Islands
Channel Tunnel and New Eurasia Land Bridge
Sejong City and Big Dig

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why were land prices a problem near the Suramadu Bridge?
They made building new homes too difficult
They caused shops to close down or move
They made it harder for families to stay in homes
They fell too much and hurt local businesses
They raised taxes for people in the area

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of internet connection was Australia originally planning to use for the NBN?
A wireless router plan in each household
A mobile hotspot system across the country
A fiber-optic network to replace old cables
A signal tower system using radio waves
A satellite-based service for homes

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What caused Canada to change its high-speed rail plan?
High costs and political discussions
Not enough trained train drivers
New airports being built instead
Pressure from nearby countries
A large number of public protests

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the Channel Tunnel had never been built, what would MOST LIKELY still be true?
People would still fly or sail between the two countries
The channel waterway would become a roadway
Trade between the countries would have stopped
The UK and France would have made a shared city
Europe would have fewer people living in it

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?