Software Risks and Identification, Reengineering

Software Risks and Identification, Reengineering

University

45 Qs

quiz-placeholder

Similar activities

Quiz Latihan Soal-Soal Pra UTS-2021-1

Quiz Latihan Soal-Soal Pra UTS-2021-1

University

50 Qs

504L UT5 T30R1 B4H454 D4N 0T0M4T4 2021-1

504L UT5 T30R1 B4H454 D4N 0T0M4T4 2021-1

University

50 Qs

CSIRT_2022

CSIRT_2022

University

50 Qs

QCM DS4H 19jan24

QCM DS4H 19jan24

University

50 Qs

Bài Quiz không có tiêu đề

Bài Quiz không có tiêu đề

10th Grade - University

44 Qs

Unit 4_ Orthographic views of basic solids

Unit 4_ Orthographic views of basic solids

University

40 Qs

Đề cương ôn tập cuối học kỳ I môn công nghệ

Đề cương ôn tập cuối học kỳ I môn công nghệ

8th Grade - Professional Development

40 Qs

APPTITUDE TEST

APPTITUDE TEST

University

50 Qs

Software Risks and Identification, Reengineering

Software Risks and Identification, Reengineering

Assessment

Quiz

Instructional Technology

University

Medium

Created by

Bit Ryan

Used 1+ times

FREE Resource

45 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. What all has to be identified as per risk identification?

a) Threats

b) Vulnerabilities

c) Consequences

d) All of the mentioned

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. Which one is not a risk management activity?

a) Risk assessment

b) Risk generation

c) Risk control

d) None of the mentioned

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. What is the product of the probability of incurring a loss due to the risk and the potential magnitude of that loss?

a) Risk exposure

b) Risk prioritization

c) Risk analysis

d) All of the mentioned

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. What threatens the quality and timeliness of the software to be produced?

a) Known risks

b) Business risks

c) Project risks

d) Technical risks

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. What threatens the viability of the software to be built?

a) Known risks

b) Business risks

c) Project risks

d) Technical risks

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. Which of the following is not a business risk?

a) building an excellent product or system that no one really wants

b) losing the support of senior management due to a change in focus or change in people

c) lack of documented requirements or software scope

d) losing budgetary or personnel commitment

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. Which of the following is a systematic attempt to specify threats to the project plan?

a) Risk identification

b) Performance risk

c) Support risk

d) Risk projection

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?