Software Risks and Identification, Reengineering

Software Risks and Identification, Reengineering

University

45 Qs

quiz-placeholder

Similar activities

MEC-142 Physical Metallurgy Final

MEC-142 Physical Metallurgy Final

11th Grade - University

46 Qs

Quiz Latihan Soal-Soal UTS Teori Bahasa dan Otomata 2020-2

Quiz Latihan Soal-Soal UTS Teori Bahasa dan Otomata 2020-2

University

50 Qs

CNPM 2

CNPM 2

University

50 Qs

Pengantar Teknologi Informasi

Pengantar Teknologi Informasi

University

45 Qs

General Translation Theory 2023

General Translation Theory 2023

University

40 Qs

ATIVIDADE AVALIATIVA DE REVISÃO DE SD - 3ª MENÇÃO

ATIVIDADE AVALIATIVA DE REVISÃO DE SD - 3ª MENÇÃO

University

50 Qs

Đề cương ôn tập Công nghệ cuối học kì 1 (lớp 5)

Đề cương ôn tập Công nghệ cuối học kì 1 (lớp 5)

5th Grade - University

47 Qs

Korean and Japanese Literature

Korean and Japanese Literature

University

50 Qs

Software Risks and Identification, Reengineering

Software Risks and Identification, Reengineering

Assessment

Quiz

Instructional Technology

University

Practice Problem

Medium

Created by

Bit Ryan

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

45 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. What all has to be identified as per risk identification?

a) Threats

b) Vulnerabilities

c) Consequences

d) All of the mentioned

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. Which one is not a risk management activity?

a) Risk assessment

b) Risk generation

c) Risk control

d) None of the mentioned

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. What is the product of the probability of incurring a loss due to the risk and the potential magnitude of that loss?

a) Risk exposure

b) Risk prioritization

c) Risk analysis

d) All of the mentioned

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. What threatens the quality and timeliness of the software to be produced?

a) Known risks

b) Business risks

c) Project risks

d) Technical risks

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. What threatens the viability of the software to be built?

a) Known risks

b) Business risks

c) Project risks

d) Technical risks

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. Which of the following is not a business risk?

a) building an excellent product or system that no one really wants

b) losing the support of senior management due to a change in focus or change in people

c) lack of documented requirements or software scope

d) losing budgetary or personnel commitment

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. Which of the following is a systematic attempt to specify threats to the project plan?

a) Risk identification

b) Performance risk

c) Support risk

d) Risk projection

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Instructional Technology