PSMS Session 4.1

PSMS Session 4.1

Professional Development

10 Qs

quiz-placeholder

Similar activities

Indicadores de Gestión

Indicadores de Gestión

Professional Development

10 Qs

Kuis Agenda 3

Kuis Agenda 3

Professional Development

10 Qs

CORONA QUIZ

CORONA QUIZ

Professional Development

10 Qs

Anime 99

Anime 99

9th Grade - Professional Development

13 Qs

Redmi Note 10 Series

Redmi Note 10 Series

Professional Development

12 Qs

PTS & PSM Integrity Amazing Race Quiz

PTS & PSM Integrity Amazing Race Quiz

Professional Development

10 Qs

Complete Recovery  EQ DAY 2

Complete Recovery EQ DAY 2

Professional Development

10 Qs

Design Thinking - Quiz

Design Thinking - Quiz

Professional Development

15 Qs

PSMS Session 4.1

PSMS Session 4.1

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Hard

Created by

Edgie Polintan

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Except as otherwise provided in the GAA, the stock on hand of supplies, materials and equipment spare parts, acquired through ordinary and emergency purchase, shall at no time exceed the normal time requirement of how many months?

1 month

2 months

3 months

4 months

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A method wherein the latest demand figure is added to the running sums and the oldest demand subtracted:

Moving average

Last period technique

Experimental smoothing method

Averaging technique

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Two (2) months’ supply is determined by computing the average monthly consumption of the agency for the last ______ months plus 10% allowance for contingencies multiplied by two (2).

3 months

6 months

9 months

12 month

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Failure to deliver within the prescribed period shall render the supplier/contractor liable for penalty, usually in the form of liquidated damages in the amount of one-tenth of one percent of the total cost of undelivered items in the contract shall be deducted for every day of delay.

True

False

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Once the stock level reaches ROP, an order is initiated for additional stock

True

False

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Extension of time of delivery may be granted only when?

In cases of force majeure or fortuitous event, or an act of God

Any reason beyond the control of the contractor

Delay is attributable to the owner or the like

All of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All supplies shall be adequately contained, packed, crated, cased, bundled, wrapped or sealed to prevent damage, spoilage and loss. They must be plainly labelled and marked on the outside showing the exact contents.

True

False

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development