PSMS Session 4.1

PSMS Session 4.1

Professional Development

10 Qs

quiz-placeholder

Similar activities

Constitution and By-Laws Quiz

Constitution and By-Laws Quiz

Professional Development

10 Qs

LABOR LEGISLATION

LABOR LEGISLATION

Professional Development

10 Qs

Osh practitioner_module 4 & 5

Osh practitioner_module 4 & 5

Professional Development

12 Qs

HFTSK_Jul2024_Session6_Property_Part2

HFTSK_Jul2024_Session6_Property_Part2

Professional Development

7 Qs

Ofsted

Ofsted

Professional Development

10 Qs

Health and Safety Awareness

Health and Safety Awareness

Professional Development

15 Qs

A)Prestressed Concrete HW(IBC-318)

A)Prestressed Concrete HW(IBC-318)

Professional Development

10 Qs

Prestressed Quiz 1a

Prestressed Quiz 1a

Professional Development

10 Qs

PSMS Session 4.1

PSMS Session 4.1

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Edgie Polintan

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Except as otherwise provided in the GAA, the stock on hand of supplies, materials and equipment spare parts, acquired through ordinary and emergency purchase, shall at no time exceed the normal time requirement of how many months?

1 month

2 months

3 months

4 months

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A method wherein the latest demand figure is added to the running sums and the oldest demand subtracted:

Moving average

Last period technique

Experimental smoothing method

Averaging technique

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Two (2) months’ supply is determined by computing the average monthly consumption of the agency for the last ______ months plus 10% allowance for contingencies multiplied by two (2).

3 months

6 months

9 months

12 month

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Failure to deliver within the prescribed period shall render the supplier/contractor liable for penalty, usually in the form of liquidated damages in the amount of one-tenth of one percent of the total cost of undelivered items in the contract shall be deducted for every day of delay.

True

False

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Once the stock level reaches ROP, an order is initiated for additional stock

True

False

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Extension of time of delivery may be granted only when?

In cases of force majeure or fortuitous event, or an act of God

Any reason beyond the control of the contractor

Delay is attributable to the owner or the like

All of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All supplies shall be adequately contained, packed, crated, cased, bundled, wrapped or sealed to prevent damage, spoilage and loss. They must be plainly labelled and marked on the outside showing the exact contents.

True

False

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?