WJEC Level 1-2 Engineering Unit 1: Planning Manufacture

WJEC Level 1-2 Engineering Unit 1: Planning Manufacture

9th Grade

5 Qs

quiz-placeholder

Similar activities

Engineering Careers

Engineering Careers

9th Grade

10 Qs

3D Printing: Revolutionizing How We Create

3D Printing: Revolutionizing How We Create

9th Grade

10 Qs

Electrical Symbols Quiz

Electrical Symbols Quiz

9th Grade

8 Qs

Exploring Renewable Energy Solutions

Exploring Renewable Energy Solutions

9th Grade

5 Qs

WJEC Level 1-2 Engineering Unit 1: Planning Manufacture

WJEC Level 1-2 Engineering Unit 1: Planning Manufacture

Assessment

Quiz

Engineering

9th Grade

Hard

Created by

Lisa Blyth

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A manufacturing plan should include:

only the production schedule.

the production schedule, resources, and quality control measures.

just the list of raw materials.

only the budget allocation.

2.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which of the following is a tool used in the production of an engineered outcome?

Scriber

Hammer

Paintbrush

Screwdriver

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: Equipment should be classed as any powered machinery that will be used in the production of an ________ outcome.

engineered

unexpected

random

unplanned

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The purpose of contingency planning in manufacturing is to:

ensure smooth operations during unexpected events

increase production speed

reduce labor costs

improve product quality

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Which chart is used to present plans for manufacture in a way that is easy to find key information at a glance?

Gantt Chart

Pie Chart

Bar Chart

Line Chart