Quiz_2000

Quiz_2000

10th Grade

40 Qs

quiz-placeholder

Similar activities

AP Biology Photosynthesis Review

AP Biology Photosynthesis Review

11th - 12th Grade

36 Qs

Skeletal System

Skeletal System

11th - 12th Grade

40 Qs

Cell Structure and Function Exam Review #1

Cell Structure and Function Exam Review #1

10th Grade

40 Qs

Organelles

Organelles

9th - 12th Grade

37 Qs

Meat Study Guide

Meat Study Guide

10th Grade

39 Qs

HHB 2.2 Hormonal Control of Reproduction

HHB 2.2 Hormonal Control of Reproduction

11th - 12th Grade

35 Qs

First aid

First aid

10th Grade

40 Qs

Appendicular Skeleton

Appendicular Skeleton

10th - 12th Grade

40 Qs

Quiz_2000

Quiz_2000

Assessment

Quiz

Biology

10th Grade

Easy

Created by

Hartono _

Used 2+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What is the primary goal of Lean Manufacturing?

Reduce product cost

Eliminate waste and improve efficiency

Increase production speed

Maximize equipment utilization

2.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Which of the following is NOT a key principle of Lean?

Identify value

Create flow

Increasing stock levels for safety

Seek perfection

3.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Which of the following would most likely indicate a failure in Lean implementation?

A reduction in lead time and improved efficiency

Continuous problem-solving and process refinement

An increase in work-in-progress (WIP) inventory and bottlenecks

A culture of employee involvement in waste elimination

4.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What is the term used for continuous flow production in Lean?

Push system

Pull system

One-piece flow

Batch processing

5.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

The term 'Lean' was first coined in which study?

The Machine That Changed the World

Toyota Production System

Lean Thinking

The Goal

6.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

OEE is calculated based on which three factors?

Availability, Performance, Quality

Productivity, Utilization, Efficiency

Cost, Speed, Waste Reduction

Throughput, Quality, Maintenance

7.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

A machine runs for an 8-hour shift. Due to breakdowns, it was only operational for 7.2 hours. During this time, it was supposed to produce 200 parts per hour but only achieved 170 parts per hour. Out of the total produced parts, 95% met quality standards. What is the Overall Equipment Effectiveness (OEE)?

72.6%

85.0%

73.0%

80.0%

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?