Foundations and Concrete Calculations Quiz

Foundations and Concrete Calculations Quiz

20 Qs

quiz-placeholder

Similar activities

Lit Terms 1

Lit Terms 1

9th Grade

20 Qs

Part 1 Fashion & Textiles Final Review

Part 1 Fashion & Textiles Final Review

9th - 12th Grade

20 Qs

Teks Berita

Teks Berita

7th Grade

20 Qs

Tudor houses

Tudor houses

KG - University

19 Qs

Quiz Prep #1

Quiz Prep #1

8th Grade

20 Qs

Module 10: Central America and Caribbean Assessment

Module 10: Central America and Caribbean Assessment

KG - University

15 Qs

Equine Science- Spring Semester Review  Exam 2025

Equine Science- Spring Semester Review Exam 2025

9th - 12th Grade

20 Qs

Foundations and Concrete Calculations Quiz

Foundations and Concrete Calculations Quiz

Assessment

Quiz

others

Medium

Created by

Tony Walker

Used 3+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image
What is the primary purpose of a strip foundation?
To support a wall
To cover the entire building footprint
To support isolated loads
To provide drainage

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image
Which foundation type is best suited for weak ground?
Pad Foundation
Raft Foundation
Pile Foundation
Strip Foundation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image
What material is NOT typically used in concrete foundations?
Cement
Sand
Wood
Gravel

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image
Which of the following is a key factor in calculating the volume of concrete needed?
Color of the concrete
Dimensions of the foundation
Type of aggregate
Weather conditions

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a strip foundation is 12 meters long, 0.4 meters wide, and 0.5 meters deep, what is its volume?
2.4 m³
2.0 m³
3.0 m³
2.8 m³

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image
Which foundation type consists of long, slender columns driven into the ground?
Strip Foundation
Pad Foundation
Raft Foundation
Pile Foundation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended percentage to add to concrete orders to account for wastage?
1-2%
5-10%
10-15%
15-20%

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?