Estimating 2

Estimating 2

University

10 Qs

quiz-placeholder

Similar activities

DS

DS

University

8 Qs

ข้อสอบฝึกอบรม HR

ข้อสอบฝึกอบรม HR

University

10 Qs

Test Development

Test Development

University

10 Qs

Métodos y Sistemas de Trabajo - Examen Parcial 2

Métodos y Sistemas de Trabajo - Examen Parcial 2

University

13 Qs

Business Ethics

Business Ethics

University

10 Qs

BAC1054 Process Costing

BAC1054 Process Costing

University

15 Qs

UK Knowledge Test

UK Knowledge Test

University

10 Qs

BCSI AWARENESS

BCSI AWARENESS

KG - Professional Development

15 Qs

Estimating 2

Estimating 2

Assessment

Quiz

Other

University

Practice Problem

Hard

Created by

NOOR (POLIKK)

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of a preliminary cost estimate?

To determine the final project cost

To forecast the probable construction cost before the detailed design

To negotiate contractor payments

To determine profit margins

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following factors influence a cost estimate?

Type, shape, and size of the building

Quality of materials used

Methods of construction

All of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a consequence of an excessively low preliminary cost estimate?

The design could be inferior

The project cost remains unchanged

The client receives excess funds

The construction is completed faster

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a method of preliminary cost estimation?

Floor area method

Storey enclosure method

Approximate quantities method

Net profit method

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the Unit Method of preliminary cost estimation, how is the cost estimated?

Based on the total gross floor area

By multiplying the cost per unit of accommodation by the number of units

Using elemental cost planning

By evaluating composite work items

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which method is commonly used in Malaysia to estimate the cost of air-conditioned spaces?

Floor Area Method

Cubic Method

Storey Enclosure Method

Elemental Estimate

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a key disadvantage of the Floor Area Method?

It does not consider differences in building height and shape

It is too complex for clients to understand

It cannot be used for public sector projects

It is the slowest method to obtain cost estimates

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?