Installation: Foundation & Subflooring

Installation: Foundation & Subflooring

9th Grade

20 Qs

quiz-placeholder

Similar activities

French Revolution Vocabulary quiz

French Revolution Vocabulary quiz

9th Grade - University

20 Qs

Exploring Body Systems and Cells

Exploring Body Systems and Cells

6th Grade - University

18 Qs

6.2 collision lab Q

6.2 collision lab Q

9th - 12th Grade

20 Qs

Understanding Themes in Literature

Understanding Themes in Literature

9th Grade

15 Qs

Potential & Kinetic Energy Quiz Review

Potential & Kinetic Energy Quiz Review

8th Grade - University

18 Qs

What is Economics

What is Economics

9th - 12th Grade

20 Qs

Force and Motion Test Study Guide

Force and Motion Test Study Guide

8th Grade - University

20 Qs

Chapter 2 Summative

Chapter 2 Summative

6th Grade - University

20 Qs

Installation: Foundation & Subflooring

Installation: Foundation & Subflooring

Assessment

Quiz

others

9th Grade

Hard

Created by

GUS GESLING

Used 5+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What size nails are used for installing foundation?

8d

14d

16d

4d

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT true concerning girder construction?

A. Joints should be glued together

B. Joints should be offset

C. Joints should have two to three nails every 16 inches

D. Girder material should be pressure treated

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Bridging are members installed periodically between joists to ensure which of the following?

The joists remain sloped

There is a 16 inch layoff

The headers are longer than the joists

There is a 10 inch gap between all dimensional lumber

4.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Headers cap which of the following?

The concrete slab

The brick stems

All sheet materials

The end of floor joists

5.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

In which manner should sheet flooring be applied to the joists?

Perpendicular

Parallel

Sloped

Inclined

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How are the number of plywood sheets needed for subflooring estimated?

Perimeter of structure multiplied by square footage

Area of structure multiplied by square footage

Perimeter of structure multiplied by the square footage of a sheet of plywood

Area of structure divided by the square footage of a sheet of plywood

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a type of floor in which the floor joints extend out past the foundation of the structure?

Extended floor

Raised floor

Cantilever floor

Sill floor

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?